CALL US

Inner urban construction workzone protection - Melbourne (VIC)

Project Brief

Loading bays were needed during the construction project of the Melbourne CBD towers in order to receive building materials at the site. This was a high risk are due to traffic only 1.2 metres away. This site had a limited amount of space to place a barrier capable of preventing a vehicle entering into the work zone, and also not causing the impacting driver injury.

Our Solution

Multiplex Constructions installed OmniStop Ultra Bollards to protect the workers at the loading bays.

Outcome

Project Manager: Luke Perry M: 0472 843 545

image
Work Zones Security Bollards

Worldwide Shipping Available