Loading bays were needed during the construction project of the Melbourne CBD towers in order to receive building materials at the site. This was a high risk are due to traffic only 1.2 metres away. This site had a limited amount of space to place a barrier capable of preventing a vehicle entering into the work zone, and also not causing the impacting driver injury.
Multiplex Constructions installed OmniStop Ultra Bollards to protect the workers at the loading bays.
Project Manager: Luke Perry M: 0472 843 545